DONES-PRIME and DONES-UGR

(2020-2023) Engineering and Construction Activities

Strategic objective: to support the proposal to build the DONES facility as soon as possible in Granada and to assure a fast start of the project.

Foreseen activities:

  • Full detailed characterization of the site (geotechnical, seismic, radiological, meteorological, among others)
  • Construction of some buildings (Administration Building, Warehouse, Access Gate Building and Research Center UGR-DONES).
  • Start-up of a Technical Office.
  • Start-up of the Control Systems Laboratory.
  • Start-up of the Virtual Reality Laboratory.
  • Specific training program.
  • Support to project integration activities.
  • Support to design engineering activities.
  • Construction of some specific prototypes and medium size facilities.

Projects promoted by Ciemat and Universidad de Granada.

Scroll to Top