DONES Facility
The DONES Facility will be a Plant containing all the necessary buildings and systems to house and run an accelerator‐based D‐Li neutron source to produce high‐energy neutrons at sufficient intensity and irradiation volume to simulate as closely as possible the first wall neutron flux and spectrum of future nuclear fusion reactors.
The facility will produce a 125 mA deuteron beam, accelerated up to 40 MeV and shaped to have a nominal cross section in the range from 100 mm x 50 mm to 200 mm x 50 mm, impinging on a liquid lithium target 25 mm thick cross‐flowing at about 15 m/s in front of it. The stripping reactions generate a large number of neutrons that interact with the materials samples located immediately behind the Lithium Target, in the Test Modules.